Getting Started
Install the Battery Pack
When you receive the Field PC, you must install and charge
the NiMH baery pack before using. To do this, complete the
following steps:
1. Push up on the sliding latches on the sides of the Field PC
to open the baery compartment door.
2. Place the NiMH baery pack in the le side of the baery
compartment, push down, and slide it all the way to the
right. There is a small arrow on the boom right corner of
the baery pack, make sure the arrow is pointing to the
right when it is placed in the Field PC.
Ch 1  Getting Started 7